II

-TRENE

TOTAL
COST

“TOA

qeT mL

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO. 600

Reinforced concrete structure 14'-0" x 28°-6" x 1h'-6" high O.D.
with 3’-Q" thick walls and roof and 3'-6" thick floor slab; embedded
wuolatruts in walls, ceiling and deck; divided into two rooms by a

1'-6" thick partition; explosion proof doors; complete with electrical Light. and power wiring and fixtures, ventilation and power gen-

erating equipment; total area 180 square feet; interior volume 1.440
cubic feet.

(No installed equipment. )
Construction Contract Cost
Engineering Cost

Each

70,520.58
4428.23

7h. 948.81

SUB-STATION NO. 600
Outdoor sub-station consisting of three 15 KVA transformera installed

on a reinforced concrete pad 8'-6" x 3°-6" x 0'-6" thick; primary

fuse cutouts and safety switch mounted on a wood frame; station en-

closed by 56'-6" of timber fence on 4 x 4 posta.

Bach

Installed equipment: 3 - 15 KVA "Gregory" transformers, serial No.
5026279, 482h012, 5026285, H & N No. TR-136, TR-133, TR-148.

(The above list does not contain any user-furnished or user-installed

equipment. )

1,226.52

1,226.52

XIGNGddV¥

Construction Contract Cost

Select target paragraph3