QUAN.) UNIT 6 Each TOTAL COST II AS LISTED BELOW (Continued) "TOA oft-L DESCRIPTION OF PROPERTY UNITS STATION NOS, 521.01 THRU 521.06 (Continued) Locationa: Station No. 521.01 Station No. 521.02 Station No. 921.03 Belle Daisy Edna Station Nos, 521.04 thru 521.06 Yvonne \No iastalled equipment. ) Construction Contract Cost Engineering Cost 22,1b4, 2h 255 41 22,399.65 STATION NO. 523 Preliminary engineering design only. Sonstruction Contract Coat 1 Fact 92.90 92.00 TRENE AND JANET STATION "10S. 530.01 AND 530.02 conduit and eight embedded anchor bolts. (No installed equipment. ) Construction Contract Cost Engineering Cost 1,289.00 61.81 Fa Bach 1,350.81 XIGNaAddV Reinforced concrete block 1'-0" x 1°=9" x 6'-0" high, placed vertically with 1°-0" extending above grade; with embedded 1-1/2" diameter