QUAN.)

UNIT

6

Each

TOTAL
COST

II

AS LISTED BELOW (Continued)

"TOA

oft-L

DESCRIPTION OF PROPERTY UNITS

STATION NOS, 521.01 THRU 521.06 (Continued)
Locationa:
Station No. 521.01
Station No. 521.02
Station No. 921.03

Belle
Daisy
Edna

Station Nos, 521.04 thru 521.06 Yvonne
\No iastalled equipment. )

Construction Contract Cost

Engineering Cost

22,1b4, 2h

255 41

22,399.65

STATION NO. 523

Preliminary engineering design only.

Sonstruction Contract Coat

1

Fact

92.90

92.00

TRENE AND JANET
STATION "10S. 530.01 AND 530.02

conduit and eight embedded anchor bolts.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

1,289.00
61.81

Fa

Bach

1,350.81

XIGNaAddV

Reinforced concrete block 1'-0" x 1°=9" x 6'-0" high, placed vertically with 1°-0" extending above grade; with embedded 1-1/2" diameter

Select target paragraph3