QUAN.| UNIT vase II YVONNE "IOA DESCRIPTION OF PROPERTY UNITS STATION NO. 4b1 Consists of eight 12” x 12” timbers bolted to two 4" x 12" stringers forming a frame work platform 12'-0" x 15'=4" placed 2'-0" below grade. (No installed equipment. ) Construction Contract Cost Engineering Cost 1 Fach 1,448.16 104.95 1,553.11 AS LISTED BELOW STATION NOS, 510,01 THRU 510.66 5" inside diameter asbestos-cement pipe 7'-0O”" long buried to a depth of 6'-6" with 6" of concrete grout inside, and a fitted plywood cap. Locations : 7 Stations on Alice 7 Stations on Belle 5 Stations on Clara 5 Stations on Daisy 5 Stations on Edna 6 Stations on Gene 1 Station on reef between Gene and Helen 4 Stations on Helen 6 Stations on Irene 15 Stations on Janet E.C.0. 2718 authorized the relocation of Station Nos. 510.15 thru Let-L 510.18 to new positions on Clara, as designated by the User. 66 Each XTQINGUddvV 5 Stations on reef between Helen and Irene