QUAN.

UNIT

TOTAL
COST

II

AS LISTED BELOW (Continued }

“TOA

92Tt-L

DESCRIPTION OF PROPERTY UNITS

STATION NOS, 412.01 THRU 412.24 (Continued)
Locations:
5 stations on reef between Wilma and Yvonne.

19 stationa on Yvonne.

ek

(No installed equipment. )

Construction Contract Cost

Engineering Cost

Eavh

4 067.57

237.69

4, 305,26

STATION NO. 430

Preliminary engineering design only.

‘Engineering Cost

1

Bach

288. 00

288,00

EDNA
STATION NO. 4ho

filled.

(No installed equipment. }
Construction Contract Cost
Engineering Cost

1,662.02
166.03

1

Each

1,828.05

XIGNAddV

Timber platform 10'-8" x 12'-0" placed 5'-0" below grade with vertical
frame extending 1'-0" above grade. Protected by sandbags and back

Select target paragraph3