QUAN. UNIT TOTAL COST II AS LISTED BELOW (Continued } “TOA 92Tt-L DESCRIPTION OF PROPERTY UNITS STATION NOS, 412.01 THRU 412.24 (Continued) Locations: 5 stations on reef between Wilma and Yvonne. 19 stationa on Yvonne. ek (No installed equipment. ) Construction Contract Cost Engineering Cost Eavh 4 067.57 237.69 4, 305,26 STATION NO. 430 Preliminary engineering design only. ‘Engineering Cost 1 Bach 288. 00 288,00 EDNA STATION NO. 4ho filled. (No installed equipment. } Construction Contract Cost Engineering Cost 1,662.02 166.03 1 Each 1,828.05 XIGNAddV Timber platform 10'-8" x 12'-0" placed 5'-0" below grade with vertical frame extending 1'-0" above grade. Protected by sandbags and back