QUAN.| UNIT veose II STATION NO. 400 "TOA DESCRIPTION OF PROPERTY UNITS Preliminary engineering design only. Engineering Cost 1 Each 0.00 70.00 STATION NO. 410 Preliminary engineering design only. Engineering Coat 1 Each 19.00 19,00 REEF BETWEEN CLARA & FLORA STATION NOS. 411.01 THRU 411.47 Stakes made of 2" diameter pipe extending 4'-0" above grade or high tide. (No installed equipment. ) Construction Contract Cost Engineering Cost 16,921.97 16.12 7 Each 16,938.09 AS LISTED BELOW Fach station consists of two 2-1/2" diameter steel bara driven into S2t-L the reef to a depth of 5'-0" and supporting a 3/4" diameter steel horizontal bar approximately 5'-0" above high tide level. XIGNadddV STATION NOS. 412.01 THRU 412,2h