QUAN.| UNIT

OT
cosy

IT

ALICE (Continued )

“TOA

q2T-Lk

DESCRIPTION OF PROPERTY UNITS

STATION NO. 335 (Continued)
covered with plywood and containing twelve openings of various shapes

and sizes, mounted on two 35'-0" telephone poles set in concrete and
anchored by guy cables to four concrete deadmen.

(No installed equipment. )

Construction Contract Cost

Engineering Cost

1

Bach

11,521.40

141.15

11,662.55

STATION NO. 352

Preliminary engineering design only.

1

Construction Contract Cost

Bach

102,00

102.00

AS NOTED BELOW

STATION NOS, 390.01 THRU 390.06

A 1'=-2" diameter hole in the ground 4'-0" deep.

6

Each

Locations:

Station No. 390.04
Station Nos. 390.05 and 390.06

(No installed equipment. )

No Costs

Janet

Yvonne

David
Elmer

XIGNAddvV

Station Nos, 390.01 and 390.02

Station No. 390.03

Select target paragraph3