QUAN.| UNIT OT cosy IT ALICE (Continued ) “TOA q2T-Lk DESCRIPTION OF PROPERTY UNITS STATION NO. 335 (Continued) covered with plywood and containing twelve openings of various shapes and sizes, mounted on two 35'-0" telephone poles set in concrete and anchored by guy cables to four concrete deadmen. (No installed equipment. ) Construction Contract Cost Engineering Cost 1 Bach 11,521.40 141.15 11,662.55 STATION NO. 352 Preliminary engineering design only. 1 Construction Contract Cost Bach 102,00 102.00 AS NOTED BELOW STATION NOS, 390.01 THRU 390.06 A 1'=-2" diameter hole in the ground 4'-0" deep. 6 Each Locations: Station No. 390.04 Station Nos. 390.05 and 390.06 (No installed equipment. ) No Costs Janet Yvonne David Elmer XIGNAddvV Station Nos, 390.01 and 390.02 Station No. 390.03