QUAN.) UNIT TOTAL COST II ELMER "TOA DESCRIPTION OF PROPERTY UNITS STATION NO. 308 Reinforced concrete slab 12'-0" square and 1'-3" thick with a reinforced concrete pedestal 4'-0" x h'-0" x h'-0" fitted with a 1/2" thick steel mounting plate and various 3" diameter embedded pipe Sleeves. (No installed equipment. ) Construction Contract Cost Engineering Cost 1 Each 3,265.92 65.73 3,331.65 YVONNE STATION NO. 309 A prefabricated aluminum Bilby outside triangulation tower 75' bigh with wood platform at 70'-0" level; field bolted; three legs anchored to 3" x 12" timbers 5'-0" below grade. (No installed equipment. ) Construction Contract Cost 1 Each 2,559.00 2,559.00 FLORA An array of pipes set in concrete floor approximately 9'e6" from zero; complete with electrical and telephone connections. (No installed equipment. ) Construction Contract Cost Tet-L Engineering Cost 1,079.77 2.49 1 Rach 1,082.26 XIGNAddV STATION NO. 330