QUAN.)

UNIT

TOTAL
COST

II

ELMER

"TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 308

Reinforced concrete slab 12'-0" square and 1'-3" thick with a reinforced concrete pedestal 4'-0" x h'-0" x h'-0" fitted with a 1/2"
thick steel mounting plate and various 3" diameter embedded pipe

Sleeves.

(No installed equipment. )
Construction Contract Cost

Engineering Cost

1

Each

3,265.92

65.73

3,331.65

YVONNE
STATION NO.

309

A prefabricated aluminum Bilby outside triangulation tower 75' bigh
with wood platform at 70'-0" level; field bolted; three legs anchored
to 3" x 12" timbers 5'-0" below grade.
(No installed equipment. )
Construction Contract Cost

1

Each

2,559.00

2,559.00

FLORA

An array of pipes set in concrete floor approximately 9'e6" from zero;
complete with electrical and telephone connections.

(No installed equipment. )

Construction Contract Cost

Tet-L

Engineering Cost

1,079.77

2.49

1

Rach

1,082.26

XIGNAddV

STATION NO. 330