QUAN. UNIT

TOTAL
COST

II

ALICE (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

STATTON NO. 300 (Continued)
installation of a steel door in place of the door which was originally
designated.

Construction Contract Cost

Engineering Cost

203,951.56

210,734.46

6,782.90

ELMER
STATION NO. 301

A 125' steel tower (combination of two existing 75’ towers) horizontally and vertically cross-braced, shop welded and field bolted; a

1h'-3" x 1ht-3" x 8'-0" O.D. cab with 3/16" checkered floor plate and

aluminum sides and roof is mounted above the 125' level; four vertical

legs anchored to reinforced concrete footings; steel stairway inside
of frame; dumb-waiter on outside of frame equipped with operating unit

on concrete pad; eight guye of 1-1/4" galvanized bridge strand from

112'-6" level to reinforced concrete anchore; includes 24'-0" x 9'=6"
x 9'-0" high frame generator shed on 6" concrete pad with corrugated

aluminum sides and roof; complete with electrical wiring and fixtures

including search lights, flood lights, obstruction lights and power
to Users equipment.

Rach

floor at elevation 87.5 feet, similar to the floor at elevation 112.5
feet: includes all necessary electrical fixtures and circuits.

E.C.0. 3716 authorizes the inverting and welding of bolts at side "C"

Ltt-2

at the 125 foot level of Station No. 301 to facilitate the removal and
replacement of the hand rail.

XIGNadddV

E.C.0. 3702 (paragraphs 1 and 3) authorizes the construction of a

Select target paragraph3