YVONNE (Continued )

"TOA

DESCRIPTION OF PROPERTY UNITS

251

Heavy timber frame structure, 8'-0" x 4'-0" x approximately 8'-0"
high mounted on a 8" wide x 5'-0" long x 4” thick concrete footings

top and upper 4'-0" of sides covered with 1/2" extericr plywood; earth

fill built up approximately 8'-0" from finish grade to top of struc-

ture and out, sloping away at 1-1/2 to 1 maximum.
Installed equipment:

Each

1 - 5 KVA “Gregory” transformer, serial No.

5026231, H & N No. TR-59.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

1,219.08
187.87

1,406.95

STATION NO. 252
Consists of rehabilitation of Greenhouse Station 6B, including in-

atallation of dehumidification units; lighting panel and safety
awitches mounted on a 12'~O" x 6" x 6" electrical gutter with wiring
for lights, power and Users equipment.

Installed equipment:

Each

1 "Kilpatrick" condensor dehumidification unit,

Berial No. 331-D-122950-26, H & N No. A-128; 1 "Kilpatrick" evapora-

equipment. )

Construction Contract Cost
STI-k

Engineering Cost

22,230.80
669.68

22,900.48

XIGNaddV

tor dehumidification unit, serial No. 332-D-1-102750-23, H & N No.

A-133-A; 6 - 25 KVA transformers.
(The above list does not contain any user-furnished or user-installed