TOTAL COST IT FLORA TO IRENE (Continued) "TOA HTT-2 QUAN. UNIT DESCRIPTION OF PROPERTY UNITS STATION NO. 204 AND AUXILIARY STRUCTURES (Continued ) E.C.0. 3717 authorizes the painting of the interior of the flume, the installation of a plywood drip strip on the flume, and the installa- tion of a corrugated aluminum roof with sheathing, 12°'-0" wide, placed 1°=2" above the flume. Construction Contract Cost Engineering Cost 556,253.94 562,099.72 5,845.78 YVONNE STATION NO. 250 Consists of reactivation of Greenhouse Station 6A including installa- tion of dehumidification units; power, light and signal panels; safety switches for Users equipment; electric wiring for lights and receptacles and various other equipment. Installed equipment: Each 1 - 12" diameter "Master" supply fan, serial No. 0Z 111, H & N No. F-466; 1 "Kilpatrick" evaporator dehumidifica- tion unit, serial No. 332-D6-9852-1, H & N No. A-190-B; 1 "Kilpatrick" condensor dehumidification unit, serial No. 331-D-122950-28, H & N No. A=-127. (The above list does not contain any user-furnished or user-installed Construction Contract Cost Engineering Cost 18,051.01 2,794.50 20,845.51 XIGNAddV equipment. )