TOTAL
COST

IT

FLORA TO IRENE (Continued)

"TOA

HTT-2

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

STATION NO. 204 AND AUXILIARY STRUCTURES (Continued )
E.C.0. 3717 authorizes the painting of the interior of the flume, the
installation of a plywood drip strip on the flume, and the installa-

tion of a corrugated aluminum roof with sheathing, 12°'-0" wide, placed
1°=2" above the flume.
Construction Contract Cost

Engineering Cost

556,253.94

562,099.72

5,845.78

YVONNE
STATION NO. 250
Consists of reactivation of Greenhouse Station 6A including installa-

tion of dehumidification units; power, light and signal panels; safety
switches for Users equipment; electric wiring for lights and receptacles and various other equipment.

Installed equipment:

Each

1 - 12" diameter "Master" supply fan, serial

No. 0Z 111, H & N No. F-466; 1 "Kilpatrick" evaporator dehumidifica-

tion unit, serial No. 332-D6-9852-1, H & N No. A-190-B; 1 "Kilpatrick"
condensor dehumidification unit, serial No. 331-D-122950-28, H & N No.
A=-127.

(The above list does not contain any user-furnished or user-installed

Construction Contract Cost

Engineering Cost

18,051.01

2,794.50

20,845.51

XIGNAddV

equipment. )

Select target paragraph3