QUAN.| UNIT

eose

II

YVONNE (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

STATION NO. 50 (Continued)
Installed equipment:

1 - 10 KVA, 2h00-120/240 volt, single phase

transformer.

Construction Contract Cost

Engineering Cost

19,963.50

287-06

20, 250.56

STATION NO. 51

A 200'=0" x 200'-0" x 20'.0" wide white cross in a 200'-O" diameter
x 20'-0" wide white circle painted on a 200'-0" square black background with a 28'-3" square x 17'-0" high radar reflector in the
center; complete with electrical wiring to thirty-six 75 watt spotLights on a timber frame around the radar reflector.

Installed equipment:

1

Each

1 - 5 KVA "Gregory" transformer, serial No.

5026231, H & N NO. TR-59.
(The above list does not contain any user-furnished or user- installed

equipment. )

Construction Contract Cost
Engineering Cost

6,579.93

6,630.64

50.71,

STATION NO. 52

A 28°-3" x 28'.3" x 17°-0" high radar reflector.

LOT-L

light fixtures deleted, )

(Installation of

1

Each

XIGNAddV