QUAN.| UNIT eose II YVONNE (Continued) “TOA DESCRIPTION OF PROPERTY UNITS STATION NO. 50 (Continued) Installed equipment: 1 - 10 KVA, 2h00-120/240 volt, single phase transformer. Construction Contract Cost Engineering Cost 19,963.50 287-06 20, 250.56 STATION NO. 51 A 200'=0" x 200'-0" x 20'.0" wide white cross in a 200'-O" diameter x 20'-0" wide white circle painted on a 200'-0" square black background with a 28'-3" square x 17'-0" high radar reflector in the center; complete with electrical wiring to thirty-six 75 watt spotLights on a timber frame around the radar reflector. Installed equipment: 1 Each 1 - 5 KVA "Gregory" transformer, serial No. 5026231, H & N NO. TR-59. (The above list does not contain any user-furnished or user- installed equipment. ) Construction Contract Cost Engineering Cost 6,579.93 6,630.64 50.71, STATION NO. 52 A 28°-3" x 28'.3" x 17°-0" high radar reflector. LOT-L light fixtures deleted, ) (Installation of 1 Each XIGNAddV LEROY