QUAN.|

UNIT

TOTAL
COST

II

LEROY (Continued )

"TOA

90T-L

DESCRIPTION OF PROPERTY UNITS

STATION NO. 13 (Continued)
(No installed equipment. )
Construction Contract Cost

Engineering Cost

6,065.19

13,62

6,078.81

FRED
STATION NO. 14
Consists of reactivation of Greenhouse Station No. 775, which is a

wood building 10'-0" x 10'-0" x 7'-8" high erected on 1'-0" x 2'-0"
reinforced concrete footing and having a concrete block 5'-0" square
centered inside the structure from grade down to coral rock bed;

complete with electrical wiring and fixtures.

(No installed equipment. )

Construction Contract Cost

Engineering Cost

1

Each

208.87

123.47

332.34

YVONNE
STATION NO. 50

on 2-1/2" diameter x 15'-3" high standard pipes driven into the reef.

Drums are painted luminous flame orange and are arranged 5'-0" center
to form a 100 foot cross three drums wide; complete with 10 KVA transformer on pole, complete with fuse cutout, switch, rack, wiring, con-

duits, and fittings.

(Installation of light fixtures deleted.)

1

Each

XIGNaAddV

Consists of 117 - 55 gallon ofl drums resting above high tide level

Select target paragraph3