QUAN.| UNIT TOTAL COST II LEROY (Continued ) "TOA 90T-L DESCRIPTION OF PROPERTY UNITS STATION NO. 13 (Continued) (No installed equipment. ) Construction Contract Cost Engineering Cost 6,065.19 13,62 6,078.81 FRED STATION NO. 14 Consists of reactivation of Greenhouse Station No. 775, which is a wood building 10'-0" x 10'-0" x 7'-8" high erected on 1'-0" x 2'-0" reinforced concrete footing and having a concrete block 5'-0" square centered inside the structure from grade down to coral rock bed; complete with electrical wiring and fixtures. (No installed equipment. ) Construction Contract Cost Engineering Cost 1 Each 208.87 123.47 332.34 YVONNE STATION NO. 50 on 2-1/2" diameter x 15'-3" high standard pipes driven into the reef. Drums are painted luminous flame orange and are arranged 5'-0" center to form a 100 foot cross three drums wide; complete with 10 KVA transformer on pole, complete with fuse cutout, switch, rack, wiring, con- duits, and fittings. (Installation of light fixtures deleted.) 1 Each XIGNaAddV Consists of 117 - 55 gallon ofl drums resting above high tide level