QUAN. UNIT

II

FLORA (Continued )

TOTAL
COST

“TTIOA

OOT-L

DESCRIPTION OF PROPERTY UNITS

SUB-STATION NO. 2
Outdoor sub-station consisting of three transformers installed on a

reinforced concrete pad 8'-0" x 3'-0" x 0'-6" thick; primary fuse
cutouts and junction box mounted on a 9'-0" high unistrut tower;
station enclosed by 52 lineal feet of 8'-0" high chain Link fence in-

cluding a 3'-0" hinged gate, and grounded to a grid of #1/0 bare

Each

copper wire.

Installed equipment: 2 - 10 KVA "Uptegraff" transformers, serial Nos.
58162, 58177, H & N Nos. TR-111, TR-113; 1 = 25 KVA "Uptegraff"” transformer, serial No. 5026314, H & N No. TR-189.
(The above list does not contain any user-furnished or user- installed

equipment. )

Construction Contract Cost

1,154.56

1,154.56

STATION NO. 3

One-story wood frame construction, 12'-8" x 8'-8" x 8'-4" mean height;

Bides covered with 1/2" plywood; shed roof of composition roofing over

1" diagonal sheathing; constructed on concrete slab with perimeter
footing 1°'-2" below grade; interior sprayed with vapor-seal; platform

on roof for exhaust fan; complete with electrical wiring and fixtures;
area 0.D. 110 square feet; volume 917 cubic feet.

Installed equipment:

Bach

1 - 400 CFM "Master Fan Corp.” exhaust fan,

(The above list does not contain any user-furnished or user-installed

equipment. )

|

Construction Contract Cost
Engineering Cost

7, 2h9.06
2, 388.96

9,638.02