vSose

"TOA

QUAN.| UNIT

II

DESCRIPTION OF PROPERTY UNITS

ITEM NO. A-35 - MISCELLANEOUS MAINTENANCE WORK ORDERS
AS-BUILT DRAWING NUMBERS AND DATES:

MWO 121;
MWO 122:

MWO 123:
MWO 12h:

MWO 128:

(None)

¥FS-691

(None)
FS-627

(Job 640 Drawing)

Unissued Sketch

MWO 129:

Unisaued Sketch

MWO 135:
MWO 138:

FS-702
FS-786

MWO 132;

MWO 1h1:
MWO 1h7:
MWwO 155:

MWO 161:

(None)

FS-717
(None)
(None )

FS-756

23 May 1952
9 May 1952

10 July 1952
11 September 1952

The following Maintenance Work Orders are charged to Contract ItemNo.
A-35 and are thereby included:
MWO 121:

Site - Tilda: The airstrip was reconstructed and made
properly usable and safe.

1

Each

MWO 122:

Site - Elmer:

FS-691.

Stabilizer unit No. 2 was installed as per

Included are a surge tank, sea water pump, and all

6Q-L

the required pipes, fittings, insulation, concrete work

XIGNaddV

Costs Included in Job III - Maintenance