TI TOTAL COST “TIOA ng-L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS FRED (Continued) DISTILLATION PLANT - ADDITIONS TO E.C.0,. 94A authorizes the installation of a 20 H.P. "Ames" boiler complete with pump in Building 56, and the extension of the existing electrical wiring system. Installed equipment: Bach 1 - 20 H.P. "Ames Iron Works" steam boiler, serial No. 57200, H & N No. G-115; 1 - 1-1/K"x 1-1/4" 125 1lb., "Aurora" boiler feed pump, serial No. 318935BF, H & N No. PU-23. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 7398.54 7,398.54 FIRE HOUSE - ADDITIONS TO E.C.0. 3708 authorizes the furnishing of building parts, wash basin, Fipe and fittings to extend "Pacific Iron and Steel" building 12°. Construction accomplished by military personnel. Bach (No installed equipment. ) Construction Contract Cost 1,672.72 1,672.72 E.C.0. 85A authorizes the construction of a one-story wood and alum- inum structure, rectangular shape; 0.D. 12'-0" x 12'-0" x 8'-8" mean height, set on 5" thick concrete floor, Wood framing, corrugated aluminum siding and roofing; complete with electrical wiring and fixtures and plumbing. Floor area 144 square feet, volume 1248 cubic XIQGNaAddV LATRINE - 50-MAN