DESCRIPTION OF PROPERTY UNITS

FRED (Continued)
DISTILLATION PLANT - ADDITIONS TO

E.C.0,. 94A authorizes the installation of a 20 H.P. "Ames" boiler

complete with pump in Building 56, and the extension of the existing

electrical wiring system.

Installed equipment:

Bach

1 - 20 H.P. "Ames Iron Works" steam boiler,

serial No. 57200, H & N No. G-115; 1 - 1-1/K"x 1-1/4" 125 1lb., "Aurora"

boiler feed pump, serial No. 318935BF, H & N No. PU-23.

(The above list does not contain any user-furnished or user-installed
equipment. )
Construction Contract Cost

7398.54

7,398.54

FIRE HOUSE - ADDITIONS TO
E.C.0. 3708 authorizes the furnishing of building parts, wash basin,

Fipe and fittings to extend "Pacific Iron and Steel" building 12°.

Construction accomplished by military personnel.

Bach

(No installed equipment. )

Construction Contract Cost

1,672.72

1,672.72

E.C.0. 85A authorizes the construction of a one-story wood and alum-

inum structure, rectangular shape; 0.D. 12'-0" x 12'-0" x 8'-8" mean
height, set on 5" thick concrete floor, Wood framing, corrugated
aluminum siding and roofing; complete with electrical wiring and

fixtures and plumbing.

Floor area 144 square feet, volume 1248 cubic

XIQGNaAddV

LATRINE - 50-MAN