QUAN. UNIT TOTAL COST II FRED (Continued) "TOA DESCRIPTION OF PROPERTY UNITS BASE OPERATIONS - ADDITION TO E.C.0O. 87A authorizes the construction of a one-story aluminum struc- ture, rectangular shape; 0.D. 25'-2" x 50'-8-1/2" x 13'-k" mean height. Set on a 7" thick reinforced concrete wall, 30" high; 5" thick reinforced concrete floor, Double roof separated by 2" x 4" redwood. Two 8' sliding doors. Complete with electrical wiring and fixtures. Floor area 1276 square feet, volume 17,013 cubic feet. (No new installed equipment. ) Construction Contract Cost Engineering Cost Each 5,408.17 34.29 5,442.46 BLAST PROTECTION Blast protection to buildings and facilities was accomplished in accordance with the requirements of specific buildings, needs, and loca- In general, doors were removed and either stored or laid flat (No installed equipment. ) Construction Contract Cost eg-! Engineering Cost 40,907.91 4 109.62 locale 45,017 .53 XIGNGUddV tions. on the floor; window shutters were locked in the open position; drive pins were added to the wall sill members; posts and timber beams were installed for roof support where required; cable guys were attached to building frames and anchored to concrete deadmen where required; buildings were shored and braced, and wall panel sections were removed as deemed necessary; all water, oil, and gas storage tanks were filled to capacity; towers and other high structures were securely guyed and anchored.