E.C.0O. 87A authorizes the construction of a one-story aluminum struc-

ture, rectangular shape; 0.D. 25'-2" x 50'-8-1/2" x 13'-k" mean height.

Set on a 7" thick reinforced concrete wall, 30" high; 5" thick reinforced concrete floor,

Double roof separated by 2" x 4" redwood.

Two 8' sliding doors. Complete with electrical wiring and fixtures.
Floor area 1276 square feet, volume 17,013 cubic feet.
(No new installed equipment. )
Construction Contract Cost
Engineering Cost

Each

5,408.17
34.29

5,442.46

BLAST PROTECTION
Blast protection to buildings and facilities was accomplished in accordance with the requirements of specific buildings, needs, and loca-

In general, doors were removed and either stored or laid flat

(No installed equipment. )

Construction Contract Cost

eg-!

Engineering Cost

40,907.91

4 109.62

locale

45,017 .53

XIGNGUddV

tions.

on the floor; window shutters were locked in the open position; drive
pins were added to the wall sill members; posts and timber beams were
installed for roof support where required; cable guys were attached
to building frames and anchored to concrete deadmen where required;
buildings were shored and braced, and wall panel sections were removed as deemed necessary; all water, oil, and gas storage tanks were
filled to capacity; towers and other high structures were securely
guyed and anchored.