TOTAL
COST

IT

FRED (Continued)

“TOA

2g-h

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUTLDING NO. 61 - ADDITIONS TO (Continued)
electrical service line to Building 61, with interior wiring and two

receptacles.
(No installed equipment. )

Each

Construction Contract Cost

379.17

379.17

BUILDING NO, 118 - ADDITIONS TO
E.C.0. 9Q1A authorizes the installation of a new 3 phase, 220 volt
power line cable from the existing transformer station adjacent to
the building, to a new 30 ampere main circuit breaker and a small

power panel inside of the building.

Each

(No installed equipment. )

Construction Contract Cost

419.22

419.22

BUILDINGS 153 AND 155 - MODIFICATIONS TO
E.C.0. 3701 authorizes the replacement of existing electric service

lines at Buildings 153 and 155.

The following approximate quantities

1200 lineal feet of #1 weather-proof wire,

150 lineal feet of #4 weather-proof wire, one 35 foot pole with downguy and anchor, one 3 spool secondary rack, and one 60 ampere switch.
(No installed equipment. )
Construction Contract Cost

153.36

153.36

XIGNaddv

of materials were used: