COMPLETION REPORT CONTRACT NO. “TOA for AT-(29-2)-20 IT OPERATION IVY DESCRIPTION OF PROPERTY UNITS QUAN. UNIT TOTAL COST FRED BUILDING NO. 4-A - ADDITIONS TO E.C.0. 9OA authorizes the construction of a new antenna tuning box shelter, wood building with 4" x 4" corner posts set on 2" x 4" plate attached to 4" x 4" foundation; coof and sides of corrugated aluminum. Army furnished labor. Each (No installed equipment.) Construction Contract Cost 391.77 351.77 BUILDING NO. 15 - MODIFICATIONS TO E.C.0, 89A authorizes the installation of one dehumidification unit and the revision of the existing ducts in accordance with the drawings. Installed equipment: Each 1 “Industrial” dehumidification unit, serial No, 21420, H & N No. A-1864. (The above list does not contain any user-furnished or user-installed Construction Contract Cost Engineering Cost 13,793.78 1,036.34 BUILDING NO. 61 - ADDITIONS TO Te-L E.C.0. 92A authorizes the installation of a new 3 phase, 220 volt 14,830.12 XIQGNaGddv equipment. )