COMPLETION

REPORT

CONTRACT

NO.

“TOA

for

AT-(29-2)-20

IT

OPERATION IVY
DESCRIPTION OF PROPERTY UNITS

QUAN. UNIT

TOTAL
COST

FRED
BUILDING NO. 4-A - ADDITIONS TO
E.C.0. 9OA authorizes the construction of a new antenna tuning box

shelter, wood building with 4" x 4" corner posts set on 2" x 4" plate

attached to 4" x 4" foundation; coof and sides of corrugated aluminum.
Army furnished labor.

Each

(No installed equipment.)
Construction Contract Cost

391.77

351.77

BUILDING NO. 15 - MODIFICATIONS TO
E.C.0, 89A authorizes the installation of one dehumidification unit
and the revision of the existing ducts in accordance with the drawings.

Installed equipment:

Each

1 “Industrial” dehumidification unit, serial

No, 21420, H & N No. A-1864.

(The above list does not contain any user-furnished or user-installed

Construction Contract Cost
Engineering Cost

13,793.78
1,036.34

BUILDING NO. 61 - ADDITIONS TO

Te-L

E.C.0. 92A authorizes the installation of a new 3 phase, 220 volt

14,830.12

XIQGNaGddv

equipment. )

Select target paragraph3