QUAN.| UNIT TOTAL COST TI ELMER, CMR AREA (Continued) “TOA DESCRIPTION OF PROPERTY UNITS TANK - SALT WATER ELEVATED (Continued) (The previous list does not contain any user-furnished or user- installed equipment. ) Construction Contract Cost Engineering Cost 28,370.85 575.56 28,946.41 WATER SYSTEMS - DOMESTIC (FRESH AND SALT) A fresh and salt water distribution system, for domestic uses, con- sisting of 1920 lineal feet of 4" transite, Class 150 mains, with cast iron fittings and valves. A total of eight water services, carlon, consists of the following sizes: FRESH WATER SYSTEM quantity 1 1 2 Total Lineal Feet Size 1-1/2" 1" 3/h" 10 70 115 Quantity ; 6L-1 2 Total Lineal Feet Size 2. 10 3/4 it 115 70 L $ystem XIGNAddV SALT WATER SYSTEM