QUAN. UNIT TOTAL COST II ELMER, CMR AREA (Continued) “TOA DESCRIPTION OF PROPERTY UNITS SALT WATER DISTRIBUTION SYSTEM - COOLING (Continued) Transite pipe, Class 150, 12" diameter - 1545 lineal feet. Transite pipe, Class 150, 6" diameter - 285 lineal feet. Transite pipe, Class 150, 4" diameter - 80 lineal feet. Also included in this system is a reinforced concrete combination standpipe and manhole, located near Building 339 and of over-all out- side dimensions 8'-0" x 4'-4" x 12'-8" deep. All piping is approxi- mately 4'-9" below grade, imbedded in compacted sand. The system includes all necessary valves, plugs, nipples and connections. E.C.0. 274 consists of the installation of a dual salt water strainer in a by-pass of the main distribution line to Buildings 330 and 344. Construction Contract Cost Engineering Cost 48,085.69 1,217.66 bystem 49, 303.35 SEWER SYSTEM - SANITARY AND COOLING WATER WASTE This combined system is comprised of three separate sections serving the area as follows: South East Section A combined cooling water waste and sanitary sewer extends from the The main line consists of 383 lineal feet of 21" VCP, two manholes and six service connections. Central Section LL-2 A combined cooling water waste and sanitary sewer consisting of 235 XIGNGddV Power Plant to the ocean reef.