QUAN. UNIT

TOTAL
COST

II

ELMER, CMR AREA (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

SALT WATER DISTRIBUTION SYSTEM - COOLING (Continued)
Transite pipe, Class 150, 12" diameter - 1545 lineal feet.
Transite pipe, Class 150, 6" diameter - 285 lineal feet.

Transite pipe, Class 150,

4" diameter -

80 lineal feet.

Also included in this system is a reinforced concrete combination
standpipe and manhole, located near Building 339 and of over-all out-

side dimensions 8'-0" x 4'-4" x 12'-8" deep.

All piping is approxi-

mately 4'-9" below grade, imbedded in compacted sand.

The system

includes all necessary valves, plugs, nipples and connections.

E.C.0. 274 consists of the installation of a dual salt water strainer

in a by-pass of the main distribution line to Buildings 330 and 344.

Construction Contract Cost
Engineering Cost

48,085.69
1,217.66

bystem

49, 303.35

SEWER SYSTEM - SANITARY AND COOLING WATER WASTE
This combined system is comprised of three separate sections serving
the area as follows:

South East Section
A combined cooling water waste and sanitary sewer extends from the

The main line consists of 383 lineal

feet of 21" VCP, two manholes and six service connections.

Central Section

LL-2

A combined cooling water waste and sanitary sewer consisting of 235

XIGNGddV

Power Plant to the ocean reef.