TOTAL .COST II ELMER, CMR AREA (Continued ) “TOA g9G~L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS SUB-STATION 339 (T-28) (Continued) Installed equipment: 3 = 37.5 KVA "General Electric” outdoor trans- formers, serial Nos. 5127731, 512722, 5127717, H& N Nos. TR-219, TR220, TR=221, (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 9,804.40 369.65 10,174.05 SUB-STATION 3h0 (T-26) Reinforced concrete slab, located in the vicinity of Building 340. Its dimensions are 13'-0" long x 10'-6" wide and includes an angle frame to support oil fuse cutouts, It is surrounded by gravel 6" deep, and enclosed by an 8'-0" high chain link fence the east side of which also forms a portion of the CMR Area fence, with 3 strands of barbed wire on top, and an entrance gate on the west side. Over- all area is 342 square feet. Each Installed equipment: 1 "Westinghouse" weatherproof power panel, (no Serial No.), H& N No. E-368; 3 - 100 KVA "Allis Chalmers” oil immerssd outdoor transformers, serial No. 2450707, No. 2450702, No. 2450680, H & N Nos. E-306, E-309, E-310. Construction Contract Cost Engineering Coat 31,896.22 1,202.56 33,098.78 XIGNGddV (The above list does not contain any user-furnished or user-installed equipment. )