TOTAL
.COST

II

ELMER, CMR AREA (Continued )

“TOA

g9G~L

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

SUB-STATION 339 (T-28) (Continued)
Installed equipment:

3 = 37.5 KVA "General Electric” outdoor trans-

formers, serial Nos. 5127731, 512722, 5127717, H& N Nos. TR-219, TR220, TR=221,

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

9,804.40
369.65

10,174.05

SUB-STATION 3h0 (T-26)

Reinforced concrete slab, located in the vicinity of Building 340.

Its dimensions are 13'-0" long x 10'-6" wide and includes an angle

frame to support oil fuse cutouts,

It is surrounded by gravel 6"

deep, and enclosed by an 8'-0" high chain link fence the east side

of which also forms a portion of the CMR Area fence, with 3 strands
of barbed wire on top, and an entrance gate on the west side. Over-

all area is 342 square feet.

Each

Installed equipment: 1 "Westinghouse" weatherproof power panel, (no
Serial No.), H& N No. E-368; 3 - 100 KVA "Allis Chalmers” oil immerssd outdoor transformers, serial No. 2450707, No. 2450702, No.

2450680, H & N Nos. E-306, E-309, E-310.

Construction Contract Cost
Engineering Coat

31,896.22
1,202.56

33,098.78

XIGNGddV

(The above list does not contain any user-furnished or user-installed
equipment. )

Select target paragraph3