ELMER, CMR AREA (Continued) QUAN. UNIT TOTAL COST II “TOA DESCRIPTION OF PROPERTY UNITS BUILDING 330 - MODIFICATIONS TO Modifications and additions were made to Building 330 as follows: (1) A wood frame shed was added to the north end of Building 330, with outside dimensions of 19'-8" long x 12'-k" wide, x 10'-2" mean height, with corrugated aluminum siding and roofing, and resting on a new reinforced concrete floor. A new pit with inside dimensions 12'=0" long x 4'=0" wide «x 4'=0" deep, and two reinforced concrete equipment foundations were constructed. A checker plate cover was provided for the pit. Area of new addition is 242 square feet and the volume is 2468 cubic feet. (2) A wood frame shed was added to the west of Building 330, with outside dimensions of 8'-&" long x 5'-9" wide x 10'-2" mean height and resting on a new reinforced concrete floor slab. Cooling water supply and return lines were extended from the pumpe at the south end of the existing building to a new vacuum pump (not in contract) in the new addition, Area of new addition ta 50 square feet and the volume is 510 cubic feet. (3) A 46'-0" long section of the west wall of Building 330 was removed and a wood frame extension was added with outside dimensions of 45'.0" long x 9'-0" wide, with an average height of 12'-10" from floor to plate line, with corrugated aluminum siding, and using the existing canopy for (4) A 120 gallon tank was relocated at the concrete pad at the south end of Building 330, and two new circulating pumps were installed. (5) Two new small concrete pads were added, one at the north end and one at the south end of Building 330. €S-L All the necessary cooling water lines, salt water lines, fresh water XIGNAYdav the roof. Area of the new space thus acquired is 414 square feet and the wolume is 5382 cubic feet. A new reinforced concrete floor and compressor foundation was constructed for this addition. A new lige - uefier hydrogen Lift well, two new doors to the existing building, a new Stainless steel hood and exhaust fan, and new ventilating duct work was installed. Four vacuum pumps, a stainless steel hood, a vent and fan, and miscellaneous ventilating duct work was relocated.