CONTRACT NO.

REPORT

“TOA

2oek

COMPLETION
for

AT-(29-2)-20

DESCRIPTION OF PROPERTY UNITS

IT

OPERATION IVY
QUAN. UNIT

TOTAL
COST

ELMER, CMR AREA
BUILDING 329 - MODIFICATIONS TO
The following modifications and additions were made to Building 329;

the washroom was rearranged and a new Lavatory and water closet were

added: a new 10” x 10" roof vent was installed over the washroom; a

wood frame wall with wood louvers was built at the north end of the

passageway between Buildings 329 and 330: and 3 reinforced concrete

pada, each approximately 5'-0" square in size, was added adjacent to

the east wall of Building 329; a new concrete pad was built adjacent

to the north end of Building 329 and adjacent to the south and west

Side of Building 330; a drinking fountain was added in the passageway
north of Building 329. These alterations and additiona include all

the necesaary Soil lines, fresh water lines, galt water lines, and
mechanical and electrical fixtures and conduits.

Installed equipment:

Fach

1 = 25 watt "RCA" amplifier, serial No. 321543,

H & N No. E-34h: 1 = "RCA" paging console, (no serial No.), H & N No.
B-345: 1 - "RCA" noise cancelling microphone, (no serial No.) H& N
No, B-3h6: 1 "Electro-Voice" microphone, (no serial No.) H & N No.
E=326; 1 - 30" x 24" x 24" "Mullenbach” surface terminal cabinet,
serialNe. 2b30hS, H & N Na. E-333.,

1,682, 02

1,682. 02

‘y

Construction Contract Cost

XIGNaAddVv

(The above list does not contain any user-furnished or user-inetalled
equipment. )