CONTRACT NO. REPORT “TOA 2oek COMPLETION for AT-(29-2)-20 DESCRIPTION OF PROPERTY UNITS IT OPERATION IVY QUAN. UNIT TOTAL COST ELMER, CMR AREA BUILDING 329 - MODIFICATIONS TO The following modifications and additions were made to Building 329; the washroom was rearranged and a new Lavatory and water closet were added: a new 10” x 10" roof vent was installed over the washroom; a wood frame wall with wood louvers was built at the north end of the passageway between Buildings 329 and 330: and 3 reinforced concrete pada, each approximately 5'-0" square in size, was added adjacent to the east wall of Building 329; a new concrete pad was built adjacent to the north end of Building 329 and adjacent to the south and west Side of Building 330; a drinking fountain was added in the passageway north of Building 329. These alterations and additiona include all the necesaary Soil lines, fresh water lines, galt water lines, and mechanical and electrical fixtures and conduits. Installed equipment: Fach 1 = 25 watt "RCA" amplifier, serial No. 321543, H & N No. E-34h: 1 = "RCA" paging console, (no serial No.), H & N No. B-345: 1 - "RCA" noise cancelling microphone, (no serial No.) H& N No, B-3h6: 1 "Electro-Voice" microphone, (no serial No.) H & N No. E=326; 1 - 30" x 24" x 24" "Mullenbach” surface terminal cabinet, serialNe. 2b30hS, H & N Na. E-333., 1,682, 02 1,682. 02 ‘y Construction Contract Cost XIGNaAddVv (The above list does not contain any user-furnished or user-inetalled equipment. )