TOTAL
COST

ELMER (Continued)

II "IOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

MACHINE SHOP - ALTERATIONS AND ADDITIONS TO (Continued)
wood posts on the inside, mounted on a new 5" thick concrete slab;

additional area 960 square feet, volume 11,200 cubic feet.
(No installed equipment. )
Construction Contract Cost
Engineering Cost

Each

9,292 .B4
68.58

9,361.42

"QUE" HOUSE - ADDITIONS AND ALTERATIONS TO
E.C.0. 261 authorizes the additions and alterations to Building 120
as follows:

the addition of a wood frame structure, outside dimen-

sions 10'-4" x 20'-8" x 9'-O" mean height, plywood sheathing on roof

and sides; includes a cabinet and counters, plastic screened windows
with canvas drops.
Floor area 214 square feet, volume 1926 cubic
feet.
Kitchen equipment was removed from existing location in Build-

ing 120 and relocated in the new addition, and existing kitchen was
converted into bedrooms. A lavatory was installed in Room 101] of
Building 120. This E.C.O. includes the relocation of an aluminum
of wood paneling.

(No installed equipment. )
Construction Contract Cost
Engineering Cost

4, BAY . 23
328.10

SECURITY FENCING AND LIGHTING

6L

E.C.0. 265 authorizes the revisions and additions of the restricted

Each

5,172.33
XTIGNGddvV

partition; electrical wiring and fixtures; hot and cold water and
drain lines; and miscellaneous necessary changes in doors and patching

Select target paragraph3