TOTAL COST ELMER (Continued) II "TIOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS COMMUNICATIONS SYSTEM - ADDITIONS TO E.C.0, 3710 authorizes the installation of a 26-pair telephone cable on messenger from the exchange in Building 208 to Station No. 1002, using existing poles. (No installed equipment. ) Construction Contract Cost 930 L.F. 2,471.00 2,471.00 DUKW REPAIR SHELTER - MODIFICATIONS TO E.C.0. 269 authorizes the construction of a building service exten- sion of the salt water distribution system for fire protection at Building 360. It includes two risers with 1-1/2" angle valves, and fire hose cabinets inside the building and approximately 200 lineal feet of underground 2" service. Bach (No installed equipment.) Construction Contract Cost 2,516.15 2,516.15 FIRE HYDRANT ADDITION E.C.0. 259 authorizes the addition of a 6" standard, cast iron fire hydrant, installed in the existing salt water distribution system Building 323. Installation includes fire hydrant, one 6" bell Tee, and 6" Hub end gate valve and 9 lineal feet of 6" transite water pipe. (No installed equipment. ) Lael Construction Contract Cost 917-93 Each 917 93 XIGNGddvV between the first and second hydrants to the north of the Radsafe