TOTAL
COST

ELMER (Continued)

II "TIOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

COMMUNICATIONS SYSTEM - ADDITIONS TO

E.C.0, 3710 authorizes the installation of a 26-pair telephone cable

on messenger from the exchange in Building 208 to Station No. 1002,

using existing poles.

(No installed equipment. )
Construction Contract Cost

930

L.F.

2,471.00

2,471.00

DUKW REPAIR SHELTER - MODIFICATIONS TO

E.C.0. 269 authorizes the construction of a building service exten-

sion of the salt water distribution system for fire protection at
Building 360.
It includes two risers with 1-1/2" angle valves, and
fire hose cabinets inside the building and approximately 200 lineal

feet of underground 2" service.

Bach

(No installed equipment.)

Construction Contract Cost

2,516.15

2,516.15

FIRE HYDRANT ADDITION

E.C.0. 259 authorizes the addition of a 6" standard, cast iron fire

hydrant, installed in the existing salt water distribution system

Building 323.

Installation includes fire hydrant, one 6" bell Tee,

and 6" Hub end gate valve and 9 lineal feet of 6" transite water pipe.

(No installed equipment. )

Lael

Construction Contract Cost

917-93

Each

917 93

XIGNGddvV

between the first and second hydrants to the north of the Radsafe