DESCRIPTION OF PROPERTY UNITS

BUILDING - TASK HEADQUARTERS - MODIFICATIONS TO
E.C.0. 270, modifications to Building 221, authorizes the dehumidification and ventilation of Teletype and Code-Rooms by providing a

dehumidification unit, aluminum supply and return duct work, and by

spraying these rooms with "Vapor-Seal".

The fluorescent light fixtures

in these rooms were removed and rearranged, and two additional fixtures

were added to each room; existing wood partitions around the Toilet
Room were removed and new ones added.

New partitions were of 2" x

3" stud and 1/4" plywood construction, with 2" fiber glass insulation.

Wood louvers, 10" square, were built into wall between Toilet Room
and hallway.

Installed equipment:

bach

1 "Kilpatrick" air conditioner, serial No.

63050-8, H & N No. A-70.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost
Engineering Cost

13,056.45
1,218.95

14,275.40

CARGO UNLOADING AREA - FLOODLIGHTING
E.C.0. 3709 authorizes the installation of three new flood lights

(No installed equipment. )

Construction Contract Cost

1,152.19

Each

1,152.19

XIGNGddV

and the relocation of one existing floodlight, on existing poles,
near the cargo unloading area.