UNIT TOTAL COST IT ELMER (Continued) “TOA 9L QUAN. DESCRIPTION OF PROPERTY UNITS BUILDING - TASK HEADQUARTERS - MODIFICATIONS TO E.C.0. 270, modifications to Building 221, authorizes the dehumidification and ventilation of Teletype and Code-Rooms by providing a dehumidification unit, aluminum supply and return duct work, and by spraying these rooms with "Vapor-Seal". The fluorescent light fixtures in these rooms were removed and rearranged, and two additional fixtures were added to each room; existing wood partitions around the Toilet Room were removed and new ones added. New partitions were of 2" x 3" stud and 1/4" plywood construction, with 2" fiber glass insulation. Wood louvers, 10" square, were built into wall between Toilet Room and hallway. Installed equipment: bach 1 "Kilpatrick" air conditioner, serial No. 63050-8, H & N No. A-70. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost Engineering Cost 13,056.45 1,218.95 14,275.40 CARGO UNLOADING AREA - FLOODLIGHTING E.C.0. 3709 authorizes the installation of three new flood lights (No installed equipment. ) Construction Contract Cost 1,152.19 Each 1,152.19 XIGNGddV and the relocation of one existing floodlight, on existing poles, near the cargo unloading area.