QUAN. UNIT

TOTAL
COST

II

ELMER (Continued)

“IOA

DESCRIPTION OF PROPERTY UNITS

BOILER HOUSE - ADDITION OF AND POWER PLANT - ALTERATIONS TO (Continued)
100582, (no H & N Nos.); 1 - 100 KVA "Westinghouse" transformer,
serial No. 5394934 (no H & N No.)3 2 - 75 KVA "Niagara-Erie Blectric

Co." transformer, serial Nos. 12670, 12856, (no H & N Nos.).

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

150,980.64

150,980.64

BUILDING - AEC ADMINISTRATION - ALTERATIONS TO
E.C.Q. 275 authorizes the addition of 70 lineal feet of standard

corrugated aluminum partitions, 6'-9" high dividing the existing

Conference Room into four areas; and the installation of one 3 panel
wood door in an existing frame partition.

Each

E.C.0. 283 authorizes the addition of a atandard corrugated aluminum
partition, 10°-0" long x 6'-9" high with a standard door inatalled
in Room A-16.
E.C.0. 296 authorizes the addition of a corrugated aluminum door in
the corridor at the east end of the south wing of Building 209, and

Construction Contract Cost

Gtr

Engineering Cost

1,474.74

68.58

1,543.32

XIGNGUddV

30 lineal feet of 8" x 8" bumper guard exterior to the building.
(No installed equipment. )}