TOTAL
COST

ELMER (Continued)

II "TOA

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

BUILDING NO, 313 - MODIFICATIONS TO (Continued)
partitions with 3" x 3" wire screen, each approximately 25'-0" long,

built into corner of Warehouse area; shelving added; new concrete
pad added; light fixtures relocated and new light fixtures and receptacles added.

(No new installed equipment. )

Construction Contract Cost

Each

4,966.93

966.93

BLAST PROTECTION
Blast protection to buildings and facilities was accomplished in

accordance with the requirements of specific buildings, needs, and
locations. In general, doors were removed and either stored or laid

flat on the floor; window shutters were locked in the open position;
drive pins were added to the wall sill members; posts and timber

beams were installed for roof support where required; cable guys were
attached to building frames and anchored to concrete deadmen where
required; buildings were shored and braced, and wall panel sections
were removed as deemed necessary; all water, oil, and gas storage

tanks were filled to capacity; towers and other high structures were
securely guyed and anchored.

Locale

Construction Contract Cost
Engineering Cost

86,740.80
4,106.94

BOILER HOUSE - ADDITION OF AND POWER PLANT - ALTERATIONS TO

€t- 2)

E.C.0. 266 authorizes the addition to Building 301 of an adjacent

90, 847.74

XIGNGddvV

(No installed equipment. )