TOTAL COST ELMER (Continued) II "TOA QUAN. UNIT DESCRIPTION OF PROPERTY UNITS BUILDING NO, 313 - MODIFICATIONS TO (Continued) partitions with 3" x 3" wire screen, each approximately 25'-0" long, built into corner of Warehouse area; shelving added; new concrete pad added; light fixtures relocated and new light fixtures and receptacles added. (No new installed equipment. ) Construction Contract Cost Each 4,966.93 966.93 BLAST PROTECTION Blast protection to buildings and facilities was accomplished in accordance with the requirements of specific buildings, needs, and locations. In general, doors were removed and either stored or laid flat on the floor; window shutters were locked in the open position; drive pins were added to the wall sill members; posts and timber beams were installed for roof support where required; cable guys were attached to building frames and anchored to concrete deadmen where required; buildings were shored and braced, and wall panel sections were removed as deemed necessary; all water, oil, and gas storage tanks were filled to capacity; towers and other high structures were securely guyed and anchored. Locale Construction Contract Cost Engineering Cost 86,740.80 4,106.94 BOILER HOUSE - ADDITION OF AND POWER PLANT - ALTERATIONS TO €t- 2) E.C.0. 266 authorizes the addition to Building 301 of an adjacent 90, 847.74 XIGNGddvV (No installed equipment. )