QUAN. UNIT TOTAL COST ELMER (Continued) TI "TIOA DESCRIPTION OF PROPERTY UNITS BUILDING NO. 211 - ALTERATIONS TO E.C.0. 286 authorizes modifications to Building 211 as follows: 1. 2. Partition between Rooms 1 and 2 was removed and relocated in Machine Shop of same building, creating two rooms of equal size in the Machine Shop. A new concrete pad, 5'-O" x 3'-6", was constructed, and an exterior door and hood was added to the west wall of Building 211. 3. Four work benches were removed and stored outside, and one work bench was relocated. 4. Existing electrical conduits were sheared and capped and two electrical conventencs outlets were added. Each (No installed equipment.) Construction Contract Cost 502 05 902.05 BULLDING NO. 212-A - ALTERATIONS AND ADDITIONS TO E.C.0, 285 authorizes the addition of an exterior concrete pad 5'-0" x 5'-6" with dehumidification relocated from interior of building; and replacement of exterior door with standard aluminum panels, and relocation of electrical panel, with necessary wiring and aluminum duct work. , (No installed equipment. ) Tt L Construction Contract Cost 1,604 .25 Unit 1,604 .25 XIGNaGAddV removal of 24 lineal feet of standard corrugated aluminum partition