TOTAL COST II YVONNE (Continued ) “TOA 9E°L QUAN. UNIT DESCRIPTION OF PROPERTY UNITS TENT - REFRESHMENT SHELTER AND PX (Continued) Installed equipment: 2. 150 cubic foot "Hussmann-Ligonier" walk-in refrigerators, serial Nos. 6501-3477, 6501-3475, H & N Nos. R-10h, R-34; 1 - 1 ton "York" flake ice machine, serial No. 269136, H&N No. CA-h; 1 - 2h" x 30" x 42" ice bin, (no serial No.), H & N No. K-247; 1 - 37" x 28" x 8" jobsite fabricated, sheet metal sink, H & N No. CA-970; 1 - 4500 cubic inch, "Meilink" fireproof safe, serial No. 8068, H & N No. 0-416. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 20,305.21 20,305.21 THEATER - OPEN AIR MOTION PICTURE Theater has seating capacity of 202 seats, 14 wood benches with back rests. Screen structure 21'-0" wide x 17'-0" high anchored to previ- ously existing concrete piers; wood stairway and platform with canopy at one side of screen. The 16'-0" x 12'-0" transite screen is 59'-6" from the projection booth which is a one-story wood and aluminum con- struction 8'-0" x 11°-6" x 8'-0" erected on a previously existing concrete slab; floor area 0.D. 92 square feet, volume 736cubic feet; complete with electrical services and fixtures. Installed equipment: Each 2 - 16 MM "RCA Victor" sound motion picture “General Electric" voltmeter, serial No. 99X33, H & N No. TM-299. (The above list does not contain any user-furnished or user-installed equipment. } Construction Contract Cost 1,294.53 1,294.53 XIGNAddvV projectors, serial Nos. 05289, 15805, H & N Nos. CA-54, CA-317; 1