YVONNE (Continued)

“TOA

fend

QUAN. UNIT

DESCRIPTION OF PROPERTY UNITS

POWER AND DISTILLATION PLANT - REHABILITATION OF (Continued)
Installed equipment: 1 - 1" x 1-1/2" x 7", 20 g.p.m. "Gould" centrifugal pump, serial No, 609A183.4, H & N No. Dl-123; 1 - 25 g.p.m.
"Worthington" feed pump, serial No. 1409918, H & N No. Dl1-178.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost 15,170.79

Engineering Cost

2,057.54

17, 228. 33

SHOWERS AND LATRINES
One-story aluminum structure, rectangular shape, size 0.D. 24'-0" x

36'-8-1/2" x 12'-0" high, erected on previously existing concrete

slab; double roof separated by 2" x 4" redwood; vented window panels;
aluminum partitions; with electrical services and fixtures; area 0.D.
981 square feet; volume 10772 cubic feet; plumbing fixtures connected

to existing services include 16 lavatories, 6 water closets and 6

urinals.

Bach

Installed equipment - Building 101:

1 - 10 gallon "Larco" water

cooler, (no serial No.), H & N No. CA-836.

Installed equipment - Building 108: 1 - 10 gallon “Larco" water
cooler, serial No. 9J-06916, H & N No. CA-176.

Construction Contract Cost 23,537.76 —

Engineering Cost

__275.36

23,813.12

XIOGNGddV

(The above list does not contain any user-furnished or user-installed

equipment. )