TOTAL COST II YVONNE (Continued) “TOA fend QUAN. UNIT DESCRIPTION OF PROPERTY UNITS POWER AND DISTILLATION PLANT - REHABILITATION OF (Continued) Installed equipment: 1 - 1" x 1-1/2" x 7", 20 g.p.m. "Gould" centrifugal pump, serial No, 609A183.4, H & N No. Dl-123; 1 - 25 g.p.m. "Worthington" feed pump, serial No. 1409918, H & N No. Dl1-178. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 15,170.79 Engineering Cost 2,057.54 17, 228. 33 SHOWERS AND LATRINES One-story aluminum structure, rectangular shape, size 0.D. 24'-0" x 36'-8-1/2" x 12'-0" high, erected on previously existing concrete slab; double roof separated by 2" x 4" redwood; vented window panels; aluminum partitions; with electrical services and fixtures; area 0.D. 981 square feet; volume 10772 cubic feet; plumbing fixtures connected to existing services include 16 lavatories, 6 water closets and 6 urinals. Bach Installed equipment - Building 101: 1 - 10 gallon "Larco" water cooler, (no serial No.), H & N No. CA-836. Installed equipment - Building 108: 1 - 10 gallon “Larco" water cooler, serial No. 9J-06916, H & N No. CA-176. Construction Contract Cost 23,537.76 — Engineering Cost __275.36 23,813.12 XIOGNGddV (The above list does not contain any user-furnished or user-installed equipment. )