QUAN. UNIT

TOTAL
COST

BUILDING NO,

II

GENE (Continued)

“TOA

DESCRIPTION OF PROPERTY UNITS

104 - DEISEL FUEL TANK

Welded steel deisel fuel o11 tank, resting on two reinforced concrete
Each

saddles.

(No installed equipment. )

Construction Contract Cost
Engineering Cost

256,343.83
8,551.53

264 ,895 . 36

BUILDING NO. 103 - SUB-STATION

Reinforced concrete pad, 10'-O" x 8'-0" x 8" thick, containing two

transformers, oil fuse cutouts, safety switches, and a mounting rack,
all surrounded by gravel fill and enclosed by a 8'-O" high chain link
fence with a 3'-0O" wide entrance gate and 3 strands of barbed wire on
top.

Installed equipment:

Each

1-37.5 KVA, 2400 - 120/240 volt single phase,

60 cycle, oil filled transformer; 1 - 50 KVA, 2400 - 120/240 volt
single phase, 60 cycle, oil filled transformer.

(The above list does not contain any user-furnished or user-installed

equipment. )

Construction Contract Cost

1,827.76

1,827.76

A one-story, wood frame structure with corrugated aluminum siding

e-)

(on both ends and one side only - one side is open) and roofing.
Outside dimensions are 85'-0" long and 31'-O" wide x 8'7-1/2" mean
height, and it rests on a reinforced concrete floor slab 6" thick,

XIGNAddV

BUILDING NO. 5 - WATER DISTILLATION PLANT