QUAN. UNIT TOTAL COST BUILDING NO, II GENE (Continued) “TOA DESCRIPTION OF PROPERTY UNITS 104 - DEISEL FUEL TANK Welded steel deisel fuel o11 tank, resting on two reinforced concrete Each saddles. (No installed equipment. ) Construction Contract Cost Engineering Cost 256,343.83 8,551.53 264 ,895 . 36 BUILDING NO. 103 - SUB-STATION Reinforced concrete pad, 10'-O" x 8'-0" x 8" thick, containing two transformers, oil fuse cutouts, safety switches, and a mounting rack, all surrounded by gravel fill and enclosed by a 8'-O" high chain link fence with a 3'-0O" wide entrance gate and 3 strands of barbed wire on top. Installed equipment: Each 1-37.5 KVA, 2400 - 120/240 volt single phase, 60 cycle, oil filled transformer; 1 - 50 KVA, 2400 - 120/240 volt single phase, 60 cycle, oil filled transformer. (The above list does not contain any user-furnished or user-installed equipment. ) Construction Contract Cost 1,827.76 1,827.76 A one-story, wood frame structure with corrugated aluminum siding e-) (on both ends and one side only - one side is open) and roofing. Outside dimensions are 85'-0" long and 31'-O" wide x 8'7-1/2" mean height, and it rests on a reinforced concrete floor slab 6" thick, XIGNAddV BUILDING NO. 5 - WATER DISTILLATION PLANT