COMPLETION

REPORT

CONTRACT

NO,

“TOA

for

AT -(29-2)-20

II

OPERATION IVY
DESCRIPTION OF PROPERTY UNITS

QUAN. UNIT

TOTAL
COST

ALICE
AIR STRIP EXTENSION
E.C.0O. 267 authorizes the clearing, grading and shaping of a soil

base, and the addition of a steel mat runway and turn around area,

TL

Construction Contract Cost

4399.46

Each

4,399.46

XIQCNGUddVv

comprising 2225 square yards of steel matting, increasing the runway

length from 800 feet to 1000 feet.
(No installed equipment. )

Select target paragraph3