VOL, Il BOOK 6 CHAPTER IV 2. Reactivated CMR, Elmer, Fred and Yvonne Power Plants. 3, Reactivated Fred and Elmer Water Distillation Plants. 4, Re-opened all camp facilities on Elmer. 5.: Operated a portable galley at Yvonne through K -1 Day to provide hot mid-day meals to all personnel required on that island, D. SUPPLY DIVISION. 1, Checked chill and frozen foods. Zz. Re-opened warehouses. 3. Commenced survey of all destroyed property and equipment E, ACCOUNTING DIVISION 1. Resumed normal operations F, INDUSTRIAL RELATIONS 1. Re-opened hospital 2. Re-opened Fire Station on Elmer. 3. Resumed all normal operations. G, ENGINEERING 1, Prepared plans for damage repair The reduction of Holmes & Narver personnel prior to M -1 Day to 800 on Eniwetok Atoll was accomplished on the premise that a total of 1,100 men (800 Holmes & Narver and 300 Task Force) would re-enter the Atoll after the MIKE Shot. However, after re-entry was completed a peak population of 1,325 men was reached, It was therefore necessary to resort to overtime work hours for camp personnel to properly support this increased population, Normal intra-atoll aircraft service was established and continued until the end of the working day of K -4 Day. From that date through K -1 Day, all air lift requirements were scheduled by the J-3 Section of Task Group 132.1 and only essential air travel was authorized. Marine craft schedules were established to meet the need of the various agencies involved in this phase of 6-55