VOL, Il BOOK 6 CHAPTER I SECTION 2 4 4, End wall facing blast was braced 5. Bracing for lean-to was installed 6. Additional securing studs were driven in wall sill plate angles Bldg. 195 - Cobbler Shop: 1. All supplies were stored in a locked hot locker Bldg. 204 - Post Office, Post Exchange, Snack Bar and Barber Shop: 1. All shutters locked open and doors removed All loose and breakable items in the post office, post exchange, snack bar and barber shop were placed on the floor and covered with canvas, All stock of the post exchange was removed from the store and placed in unused locked reefers and in the locked liquor warehouse. All display cases and shelves were laid flat on the floor, Bldg. 205 - Fire Station: 1. All shutters were locked in open position Bldg. 206 - Guard Quarters and Fire Station Supply: 1. All doors were removed 2. All shutters were locked in open position 3. Lockers were laid flat Bldgs. 208 and 209 - Administration Buildings: 1. All doors were removed 2. All shutters were locked in open position . 3, Lockers were laid flat 4. All files were laid flat Bldg. 210 - Photo Lab: 1. Windows and doors were locked in closed position 6-27