VOL. I BOOK 5 cans, CHAPTER iv SECTIONS 20-21 An antenna array was surveyed and staked in accordance with the User's sketch. Timing signals as indicated in Task Unit 10's Instrument Chart were delivered to the working point of the station. A pole for a light-weight antenna was furnished and erected unguyed, 50 feet above grade. were attached to the pole. A pulley and halyard Five hundred lead bricks on pallets were moved from the vicinity of Warehouse 4 to the vicinity of Station 930. An ammonia leak in the station's refrigeration system was located and repaired. services incurred 156 man hours. SECTION 21. PROJECT 10.1. These PROGRAWi 10 A 4-man tent with wooden floor was erected adjacent to each of Stations 1001.01, 1001.02, and 1001.03. A work bench was installed in each tent, 6 feet long, 40 inches high and 26 inches wide, to which two duplex outlets with 110 volt, single-phase power were wired. - Holmes & Narver provided electrical and water utilities to the EGG photo trailer in the Site Elmer Administration Compound. This trailer required water in the amount of 800 gallons per 24-hour period, ata rate not exceeding 120 gallons per hour. The electrical load was 10 KW at 208 volts. An 8-man tent with wooden floor and lighting outlets was erected beside the trailer. Communication antennae were furnished by the User and installed on three existing poles on Site Elmer. Holmes & Narver materials and technicians were required for the fabrication of a pyramid type aluminum radar reflector with a 5-foot square base. The material furnished was required to be of sufficient thickness to allow the reflector to be moved without distortion. holes were drilled in each corner of one side of the base. Two l-inch A 40-foot pole with antenna was erected in the AEC Compound. antenna was placed on an existing pole near Bldg. 311. A second Both antennae were furnished by the User, Holmes & Narver supplying the hardware and the pole first mentioned. The No. 14 one-pair cable between Stations 1001.02 and 305 was changed toa No. 8 one-pair cable to admit more power. In preparation for KING, four overhead lights and a siren control were installed in Bldg. 311. Labor, material and equipment were furnished to repair a drain pipe leak at the EGG trailer between Bidgs. 210 and 211 on Site Elmer. Instrumentation cables were pulled through conduits from Station 1] to Station 5 on Site Flora, and a terminal and fittings were installed. Lights were moved in Station 5 to a position in front of the relay racks. All telephone pairs in the submarine 6-pair cables Nos. 5-127 and 5-128 were transferred toa new submarine cable, No. 0-110. The pairs in 5-127 and 5-128 were cross- 5-25