PAGE 2

SURVEY SHOULD BE ACCOMPLISHED AS SOON AS POSSIBLE UPON COMPLETION OF THE NECESSARY
PLANNING AND COORDINATION,

IT SHOULD CONSIDER THE TOTAL ENVIRONMENT PERTINENT TO

REHABILITATION INCLUDING BOTH EXTERNAL RADIATION DOSAGE AND BIOLOGICAL FOOD-CHAIN
CONSIDERATIONS,

IT IS ANTICIPATED THAT TECHNICAL STANDARDS AND REQUIREMENTS WILL BE

PROVIDED BY RESPONSIBLE DIVISIONS WITHIN AEC HEADQUARTERS,

IT IS UNDERSTOOD THAT

PLANNING HAS BEEN INITIATED BY DOS AND DBER IN COOPERATION WITH FIELD ORGANIZATIONS
|

AND SUCH PLANNING WILL SERVE AS THE BASIS FOR A COMPREHENSIVE SURVEY PLAN,
PARA, IN IMPLEMENTATING
1.

THE ABOVE OBJECTIVE YOU ARE DIRECTED TO:

PREPARE A PLAN FOR THE CONDUCT OF RADIOLOGICAL FIELD SURVEY AND ANALYSIS OF
SAMPLES OBTAINED UTILIZING NECESSARY LABORATORY AND CONTRACTOR SUPPORT.

yj
4

2.

SELECT PERSONNEL NECESSARY TO CONDUCT THE FIELD SURVEY.

3.

SELECT LABORATORIES AND PERSONNEL TO ACCOMPLISH THE NECESSARY LABORATORY WORK
;
FOR ANALYSIS OF SAMPLES, THIS TASK INCLUDES ESTABLISHMENT OF PROCEDURES ,

\
;
4

STANDARDS , AND METHODS FOR CORRELATION OF DATA BETWEEN LABORATORIES.

IN THIS

CONTEXT YOU SHOULD PROVIDE FOR REVIEW AND REPORTING OF DATA,
4.

SUPPORT PATHWAY AND DOSE ASSESSMENT ACTIONS WHICH WILL COME UNDER OVERALL
TECHNICAL DIRECTION OF THE DBER, SUPPORTED BY THE DOS.

5.

ARRANGE FOR NECESSARY LOGISTIC SUPPORT

.

6.

COORDINATE LOGISTIC SUPPORT REQUIREMENTS WITH THOSE OF THE ENGINEERING SURVEY

TO BE CONDUCTED CONCURRENTLY BY DNA,
]

ee

i

7.
-

DIRECT LIAISON WITH DNA IS AUTHORIZED, AS REQUIRED, KEEPING COGNIZANT AEC
HEADQUARTERS DIVISIONS ADVISED.

Select target paragraph3