SECOND-DAY SAMPLING

a,

_— x

Roe

™.
~~,

x

~

‘AN

—

THIRD-DAY

oe SAMPLING

a

Y\
\

£

2
a

\

7

/

aN.
,

\

=

L.

x

/

*%

/

=
Vv

\

_

\

\

—

+

—

NY

zS

_

—_

K—ON

<

Xm

4

—

yo

=

=

O

x” FIRST-DAY SAMPLING

x

|
X = AIR FILTER, TOTAL y DIS/MIN PER 104 CU FT (10°)

|

© = PASSIVE COLLECTOR, NO RAIN, TOTAL y DIS/MIN (104)

|

@ = PASSIVE COLLECTOR, RAIN, TOTAL y DIS/MIN (104)

_|

(x)

BACKGROUND

ne CO) me ee ee ee ee ee a BACK GROUND
1

BRI

[|
DEN

|
PAR

|
|
[
CAS MON COL

|
FNT

[
PIN.

|
PUB

|
HAT

|
APC

|
WAL

SITE

Fig. 8—-Small Boy total gammaactivities (mobile line sites; see Fig. 1

for meaning of abbreviations).

may not be directly applicable to another location on the samelineat
another time. Consequently, interpretations involving these radionuclides must be made with this reservation in mind,
The disintegrations per minute ratios of the various fission

products to *°Mo corrected to shot time are given in Table 1 for the
air-filter samples

collected from D+2 to D+ 3. These values are

Select target paragraph3