Martin B. Biles Detector Ane eof fa" The reading dropped to 45 pR/hr or an overall reduction of a factor of three compared with the external level. On Sunday morning, May 31, the team members on Bikini began soil sampling in grouns of two along tha cleared rows. Lynch and 1 sanpled Row #7, Let Baseline South, to th2 Center Lin2 Road. Sea draving for locations. Samples were taken, disturbed and undisturbed soil, evary lud feet resulting in 1&.sampling locations. ae The cookie cutter sampler used takes a plug of soil about 4 inchzs in diameter and one inch daep. Sunday afternoon we rested and want fishing. Monday morning we resumed soil sampling. Lynch and I rampled Row #9 2nd Baseline North to First Baseline North and from First Baseline + Me ee {Tor eae, North to th2 Center Linz Road. The first stretch gave 25 sampling locations and the seond 15. Soils varied considerably in organic content is just 100 feet of distance. Most undisturbed areas con-tained a mat of leaves and twigs all intermeshed. These had to ba removed to a dapth of 3 or 4 inches to get down to soil. a -T3 IN. ad Note: Rows run lengthwise the island and the numbering systemused 4s that developed during cleanup.