QUARTERLY OPERATIONAL SUMMARY - ENGINEERING DIVISION - 3D QTR FY 78

l.

4O0G58

— ee

Narrative Summary.
°

”

This quarter represented the transition period from the orginal JTG Staf£

a.

Building on the solid base provided by the orginal staff

to the "middle year" group.

the new staff focused on the full scale production phase, i.e. move contaminated soil
to Runit

(Yvonne)

ewes.

for encryptment.
:

b. Both base camps were fully completed and operational.
The Runit complex
was also made ready and the tremie operation started on 17 Jun 78. By the end of
the quarter,

c.

1223 cubic yards of slurry had been deposited in Cactus Crater,

During the quarter, off atoll meetings and conferences shaped and refined the

mission of the task group.

a

The 3 - 4 May 1978 Conference held at Washington, D. C.

“

and attended by the Operations Officer of the JTG resulted in the refined tasking that

influenced planning activities of the JTG.
goals for soil clean up as shown below:
ISLAND USE

ORIGINAL CRITERIA

Residence

Agriculture

@
fe

Es

NEW CRITERIA

40

40

400

160

100

Picnic

5

The conference resulted in changing the

=

5

80

3

~

The conference also seriously considered changing use ofEnjebi (Janet) from Agri-

culture to Residence.

To that end,

soil removal started on Enjebi (Janet) on 27 June

1978, even though it currently meets the standard.as an Agriculture island.

Priority

of soil removal as stated in FCDNA tasking message dated 15 May 78, was Aomon (Sally)

|

goal stated.

=

to 80 pico curies per gram and Enjebi (Janet) toward 40 pico curies per gram with no

~

No other islands were mentioned,

rH
™

d, Pilot soil removal project developed the detailed procedures to be followed
for the production phase. The procedure is briefly outlined below:
(1)
Following the fine survey (normally a 25 meter grid) the area to have soil
removed is recommended by DOE/ERSP. This area is marked on the ground by USAE Survey Team.

(2) Vegetation in the area is removed and stockpiled by using a 2% CY scoop
loader with a 4 in 1 bucket to limit the amount of soil removed with the vegetation.
The vegetation is allowed to dry and then burned.

(3)

The soil is removed in 6" to 8" lifts by using a dozer to move soil to

(4)

Scoop loader loads soil on dump truck,

(5S)

The dump trucks move to beach area stockpile site.

stockpile at the edge of area.

(6) The dump trucks load on boats for over water transport, stockpile soil at
beach area stockpile or dump load in bulk haul boats.
jee

\
J

rom
bp
Le ut a!
~3 5

i

.

N

f
;

.
,

;

.

-

s
.