rm
.

-

ct tS
. SURISINE Te*eceaia

Iten

umber

one

Situation
I iI
Mit
Vehicles

Truck, 1/1, Ton

1L8 123

99

TG 7.1 Motor Pools

Truck, 2/k Ton

10, 8

69

TG 7.1 Hoter Pools

Truck, 23 Ton

2; 20

12

TC 7.1 Motor Pools

Truck, $ ton Pickup

2a 28

TG 7.1 loter Pools

Truck, Dscon

h

hk

2

TG 7.1 -otor Pools

Truck, Tractor

3

3

2

TG 7.2 sictar Pools

HOTES :
1.

The above estimatec requirerents meke no prevision for udditioral

ships to rormit an afloat operation at RIXINI since it is contempinted that

personnel will be able to remain on ENYU fer 1 shots.

In the evert personne?

ard aircraft musi be evacuated, firing will cease at SIKINI unless i'e ships at
TAQHCI are utiliced toa maintain opereticns aflcat.

If so, firings wuld then

cease at TAOUCT,.
2.

the requirerents are based on the assumptions included in this study.

For a specific oneration, they would have to be restudicd and adjustment: mads
accordingly.

3

The above d not include the ships, craft or aircraft required b: any

APSIP effects projects.

le

.

Ab TAO'GT 46 is folt thet there should be two large ships, one of

which is capable of handling and providing at least minimr maintonance
facilities for helicopters.

Select target paragraph3