APPENDIX II. SAMPLE CHECK LIST No. Zz. PHOTO STATION GENERAL ELECTRICAL FINAL CHECK LIST, EG&G. Shot Location Date l. Visually check all Connectors. 2. Throw the following switches to OFF position: SIR S6R S1B SLY Charger #1 Input Charger #1 Output Charger #2 Input Charger #2 Output 3. Throw the following switches to ON position: Gas Generator AC 24 V DC 1Z0O VDC A 120 V DC B 200 CPS (R) 2 Switches 200 CPS (B) 2 Switches 200 CPS (Y) 2 Switches 4. Throw change-over switch to MG position. {Check that this switch is securely in position) 5. Throw MG Test Toggle Switch on Inverter Starting Panel to ON Position. MG SHOULD NOW BE OPERATING. 6. Check that the following voltages appear on the Distribution panel: 120 V AC 12zO VDC A 120 VDC B 24V DC POR 8 6 | ere ns