for local
inter-ishnd ferrying. There wil,lbe installations on various
islknd~ which will require sup?ly by beri~l drop. Availability of equipment for aerial supply drops should be cuecked. ~vailability of these
aircraft for this project
on 1 January ad
is as
follows: one (1) on 1 December, two (2)
one (1) on 1 February. Oper~tiond control of these
&ircraft will rebmin with the MC
Commuder on Kwajalein unt”ilthe arrival
of the Task WiW Commander. ATC will continue to provide crews and maintentmce for the duration of the project.
2.
&s further information become avail~ble, it
to you.
BY COMMND OF MAJOR GWXEAL &RPER
JOHN’ELDAVIES
Cy furnished
Gen Kepner
29
SECTIONV
,.4
will
“beforwarded