COMMANDER TASK UNIT SEVEN POINT THRES POINT SIX U.S.S. LS¥ 250 c/o Fleet Fost Office San Francisco, California File No. 19 April 1948 CTUT.3.6/A9 Serial: 0018 Subject: 3. Report of Submarine Cable Operations. (con't) Summary of Cable Laying Operations. (2) Actual cable operations were commenced on 5 January 1948. The last submarine cable for the AEC network was laid on 9 March and the underground connections thereto were completed on ' 17 March 1948. All cables were tested, found to be in good operating condition and turned over to representatives of TG 7.1 on 17 ¥Varch 1948. Tabu- lated data covering the location, length and date each cable was leid is contained in Enclosure (A). (b) This unit also assisted personnel of TG 7.1 in ‘laying and splicing Type RG-18 U coaxial cables on Engebi, Aomon and Runit Islends as directed in Paraggeph1.(b), (5), (11) and (12) of reference (a). This work was completed on 25 March 29 Section VII

Select target paragraph3