five (135) of whom were effectively engaged in construction, Except for the fact that an additional six carpenters would have facilitated holding construction schedules and, perhaps, would have resulted in bettering the completion dates by a few days, the personnel contained in the Company were well distributed as to occupational specialties. Good leadership by the Officers of this Company, together with the superior attention to duty of a really excellent group of Non-commissioned officers in many ways offset the fact that this Company lacked somewhat in experience in this particular type of construction. With regard to the latter, the Joint Task Force Engineer and his staff provided assistance in planning and supervising the actual construction. Because of the scattered locations of buildings, blast footings, slabs and aprons to be built of concrete, it is believed that material saving in time would have resulted from the use of transitmix concrete trucks, hauling from a central batch plant; however, this particular type of equipment was not available on the atoll. Other than this, the construction equipment was. well selected as to number, type and condition. Generally all items of construction were completed on or before thedates set forth in a completion schedule which had been prepared by the JTF Engineer and accepted by the AEC prior to the start of construction. “the MK-PK Company started actual steel] erection of the Zero tower on 2 January and topped out nine days later. SECTION VIb 91 The

Select target paragraph3