a photographic aircraft missions, compilation of mission data and monitoring of drone aircraft ground maintenance operations following the return of drone aircraft to Kwajalein on X-ray Day plus five, During a visit to Kwajalein on 24 April, Col Cooney gave an informal talk to TU 7.6.1 at which time he gave a summary of the results obtained on X-ray Day and stated some of the problems anti8 Som cipated for Yoke operations. wae A final critique of the X-ray test showed that the overall operation of TU 7.6.1 had been very goog. The one flaw was that post X-ray Day operations were somewhat disorganized because of unexpected missions which came up. To correct this all monitors were given post mission day assignments for Yoke and Zebra tests. YOKE TEST Yoke test operations were carried out:3fthe same manner and on the same approximate time schedule as for X-ray test. Several additional missions were flown in connection with the operation and TU 7.6.1 personnel were pushed to the limit of physical endurance to maintain their operations schedules. DELETED AEA Restricted Data All operations in connection with the Yoke test were completed by Yoke plus nine and preparations were completed for the Zebra test very shortlythereafter. Section IX 103 es,

Select target paragraph3