CHAPTER
TASK UNIT INTERIM REPORTS AT THE TEST SITE
Technical
nnn
Measurements
Prior to the arrival of the Task Group at Eniwetok, Lt. Gage—
‘gummi, USN, had flown to the test site as advance representative for
Task Unit 7.6.6, arriving on 5 March. On this mission Lt. WE
assisted in the planning for island construction necessary to accom
modate installations for technical measurements projects to be carried
out by TG eb. Meeting with representatives of TG 7.2 and the staff
of General Hull, he outlined the program in detail and continued to
attend the regular staff meetings of TG 7.2 as representative of TU
726.6.
During the following period, until the arrival of the BAIROKO,
Lt. Vicars made several trips to each of the ZERO islands in order to
become: familiar with the personnel in charge of island construction,
the facilities available for use by the Technical Measurements Unit and
the relation of their work to that being carried on by the Bureau of
Yards and Docks and Office of the Corps of Engineers.
.
When the BAIROKO reached Eniwetok Atoll it was first anchored off
Eniwetok Island.
It was considered advisable to move all materials
required for the technical measurements under TG 7.6 along with a group
of operating personnel ashore on Engebi Island.
77
Section If
PRIVACY ACT MATERIAL REMOVED
This was accomplished