appearance of color.
Delivery of these materials was made to the USS
BAIROKO for transport to the test site.
On the voyage to the test site
it was planned to attempt calibration by exposure to the radium source
available.
Operations Plans for Technical Measurements.
When the first draft of the Scientific Director's Operation Plan
was received, Task Group 7.6 prepared a plan for carrying out the tech-
nical measurements assigned to it.
A draft of this plan was submitted
to the Scientific Director on 20 November and used as a basis for future
planning.
Much of the information in this plan was incorporated by the
Scientific Director in the over-all operations plan for the Task Force.
Frequent coordination was required with the other scientific groups,
with J-3, and with those responsible for organizing the air operations.
In January a procedure for a flight vlan for use in the C-47 aerial survey
operation was prepared in coordination with Colonel] Shephard, Task Group
7.4.
At the end of January a final draft of the operations required for
the technical measurements unit was prepared and concurred in for the
most part by the Test and Scientific Directors.