i.
2.
3.
4.
PRIVACY ACT MATERIAL REMOVED
ds
Size and location of source
e.
Absorption by thick and angular shields
Neutronse
a.
Neutron spectrum
be
Neutron flux versus distance
c.
Neutron absorption and scattering
ad.
Neutron flux versus time
Residual contamination.
a.
Direct cofit&mffation
be
Downwind fall-out
Radioactive Cloud.
az"“WaSealing
"Eta ion field from o¥Sid
ce
Long rates"detection
At this meeting SSP raised the question of who would be availabia
to underteke the work outlined in this program.
Although it was considered
desirable to have Dr. @qgqaIiummmmes undértekevthotpamaaPadi'tation
measurements, the AEC felt it was inadvisable to request his services
from.the General Satric Company"kt"tMai s* time.
aceon; agreed to
take the program back to Los Alamos for diséwésion of possible team of
implementation.
On 29 Sevtember 1947 an estimate of the equipment and personnel
which would be needed to imolement the program on gamma radiation measure-
ments was prepared by-<@MMEMMBe.
CaM and with Captain GMB.
This was discussed with Colonel
A meeting was held about 1 October
attended by Biiges, Colone] OUR,Sam, DyieiEEB, Dr.
22
Se isbnetile
PRIVACY ACT MATERIAL REMOVED
im