COMMANDER TASK U"IT SEVEN POINT THRES FOCIXT SIX U.S.S. LSM 250 c/o Fleet Post Office San Francisco, California File No. CTU7«3.6/A9 1$ april 1948 Serial: 0018 Sub-ect: Report of Submarine Cable Operations. (con't) beach at the LSM landing at Farry Island. This cable could be loaded and laid infrom 24 to 36 hours, and it is long enough to replace any individuvel length of submerine cable in the existing network. Upon completion of current operations it will be covered ‘with canvas end send, fenced and posted, and available for future operations. (bo) Should future repairs be necessary a suitable repair ship, as outlined in Fara. 5 (c) is recormended. However under the bottom condi- tions prevailing in the Eniwetok Lagoon re- pairs will be slow and difficult regardless of the type of ship employed. Experience during current operations indicates that either 42 Section VII